|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
MIDORIYAMA PROJECT |
|
|
|
|
HIROYASU TAGUCHI ART WORKS |
|
|
 |
| The view in those days. (around1969) The north east part of Tuyama basin.
(Looking toward S,S,E From mt Karasugasen) |
|
|
Midoriyama is located in the northern part of Okayama, a northeastern part
of Tsuyama Basin.
Tsuyama feudal clan is abolished in 1871, it becomes Tsuyama Prefecture,
then all over Mimasaka erea becomes Hojo Prefecture,Finaly Hojo Prefecture
has been amalgamated by Okayama Prefecture in 1876. After that, Tsuyama
has been decreasing her importance as a distrbuting place of commodities
compare to southern counterpart Okayama which advanced in transportation.
In 1975, part of the Chiyugoku expway between Suita to Ochiai was opened.Synchronizing
that, development of industrial estate had been promoted in Tsuyama erea.
Today,there are lots of industrial complex there along side of Chiyugoku
expway here in Tsuyama erea which used to be no worth mentioning industry
there.
Industrial complex in Midoriyama is one of those examples. |
|
|
|
 |
|
|
|
Inside of dotted line is the erea which developed in 70s |
| Todays midoriyama |
|
|
|
 |
|
|
|
|
About the characteristics of Midoriyama |
|
|
|
|
|
Midoriyama is a nickname of the village section, the hill is part of Ayabe
Tuyama City in properly calling. In the part of Tsuyama basin, there are
many line shaped hills run from north to south there.Those are 150m to
300m in height and approx 50m from the bottme.These hills consist of the
stratum which formed in third cenozoic era. It is thought that the sea
stretched around here about 15 million years ago. The sea expanded the
central low ground belt that ran from east to west in the Chugoku mountainous
district, and the shallow sea that was called Tsuyama sea was formed in
the middle term of the third cenozoic era as for the vicinity in a present
Tsuyama basin. Teeth fossils of shark's named Calcarodon and coral fossils,
etc. have been discovered from the todays vicinity with the Kusakabe industrial
estate. The age descends, to ancient times since primeval days, these hills
were places of the best village location for people at that time. Jomon
and Yayoi era, Ruins of both ages have been discovered around Midoriyama,
also steel manufacture ruins called the Midoriyama steel manufacture ruins
which consist two steel manufacture furnace discovered in this Midoriyama.
These evidences show us human activities from the old times here in Midoriyama.
|
|
|
|
|
|
 |
| DEM CG based on NASA90m mesh data |
|
 |
|
Previous |
P2 |
Next |
|
 |
|
|
|
|
 |
|
       |
|
| production & Copyright ; Hiroyasu Taguchi |
|
|